New Developments in Southern Georgian Bay: How to Research Growth and Future Housing Supply

Developments

Share This Post:
New Developments in Southern Georgian Bay: Buyer Guide

If you’ve driven Highway 26 or County Road 91 lately, you’ve seen the signs: new townhome models, freshly graded streets, a hotel rendering on a hoarding. Southern Georgian Bay is growing, and that’s useful to know whether you’re buying a new build, buying a resale next to a future subdivision, or simply wondering what your street will look like in five years.

Here’s the catch. A glossy sign, a planning application and a finished home are three very different things. Some projects are in build-out right now. Some are approved on paper and waiting for servicing. Others are proposals that may change, shrink or never happen. This guide shows you how to tell them apart, where to look, and what to ask before you rely on any of it.

Here, Southern Georgian Bay means six municipalities: Collingwood, Clearview Township and Wasaga Beach in Simcoe County, and The Blue Mountains, Grey Highlands and Meaford in Grey County. That’s six building departments and three conservation authorities. Thornbury, Craigleith, Stayner, Creemore and Markdale are communities inside those municipalities, not separate ones.

Why “new development” means different things in different places

Growth here doesn’t look the same from one municipality to the next. The 2021 Census counted 24,811 people in Collingwood (up 13.8% from 2016), 24,862 in Wasaga Beach (up 20.3%), 14,814 in Clearview (up 4.7%), 9,390 in The Blue Mountains (up 33.7%), 11,485 in Meaford (up 4.5%) and 10,424 in Grey Highlands (up 6.3%). [1] [3] [5] Those are 2021 counts. The first 2026 Census population and dwelling counts aren’t scheduled until February 10, 2027, so any “current population” figure you see is an estimate. [7]

The Blue Mountains is a good example of why raw population can mislead. Its 2021 profile shows 7,396 private dwellings but only 4,348 occupied by usual residents. [4] Many homes are seasonal or second properties. When you read a forecast, check whether it counts permanent households or all dwellings.

Start with the official forecasts, then treat them as forecasts

Counties publish long-range growth plans, and they’re a helpful picture of where municipalities expect to head. They aren’t promises.

Simcoe County’s approved plan, with provincial approval of its official plan amendment on April 7, 2026, forecasts 555,000 people and 198,000 jobs across its 16 local municipalities by 2051. [8] Technical housing allocations underneath that forecast include Collingwood at 42,690 people and 21,370 homes, Clearview at 21,820 people and 9,250 homes, and Wasaga Beach at 38,090 people and 18,850 homes. [9]

Grey County completed an update in 2026 that forecasts 148,580 people across the county by 2051. For the municipalities in this guide, it projects 21,980 people and 9,890 households in The Blue Mountains, 14,330 people and 5,650 households in Grey Highlands, and 14,720 people and 6,280 households in Meaford. [10] That report counts permanent household demand, not all seasonal dwellings, and it’s a technical forecast rather than a guarantee that every number will be built.

A forecast tells you what planners are preparing for. It doesn’t tell you whether a particular lot beside your potential home will be built, when, or in what form.

The ladder from idea to front door

Every new neighbourhood climbs the same ladder, and knowing the rung matters more than any marketing label.

Official plan and zoning. The official plan sets general land-use policy. Zoning sets the rules for each lot, such as permitted uses, heights and setbacks. A site can be designated for growth in the plan and still need rezoning before anything is built. [12]

Draft plan of subdivision. This proposes the layout of lots, roads and parks. Draft approval is conditional. It isn’t a registered plan, building permit or occupancy approval, and the approval lapses if the conditions aren’t met in time. [14] Lots can be marketed at this stage, but legal transfer follows registration.

Registered plan. Once conditions are satisfied, the plan is registered with the Land Registry Office and creates separate legal parcels. [14]

Site plan and condominium approvals. Townhome and condominium projects typically need site-plan approval and, for condominiums, a separate condominium process. A condominium is a form of ownership, not a guarantee that the building exists. [14]

Building permit, inspections and occupancy. The municipality issues permits and inspects at set stages. [15] An approved plan can still sit for years before the first permit.

The practical lesson is simple. When someone tells you “it’s approved,” ask which approval, and what’s still left.

What changed in Ontario’s rules, and what it means for neighbours and buyers

A few recent provincial changes affect how you follow a project.

The Provincial Planning Statement, 2024 took effect October 20, 2024 and replaced both the earlier provincial policy statement and the Growth Plan for the Greater Golden Horseshoe. [16] Bill 23 (2022) removed the mandatory public meeting for draft subdivisions, though notice and written comments still matter, and a municipality can choose to hold a meeting. [17] Bill 185 (2024) then narrowed who can appeal official plan and zoning decisions to the Ontario Land Tribunal. Affected landowners, public bodies and certain defined parties keep appeal rights, but ordinary neighbours generally don’t. [18]

For buyers, that means a project’s file and notices are your best source of information. Don’t assume you’ll see a public meeting for every subdivision, and don’t assume neighbours can stop one. A pending Bill 140 proposal would change some appeal rules again, so check its status if timing matters. [19]

Planning authority also isn’t uniform. Simcoe County remains the approval authority for the official plans of Collingwood, Clearview and Wasaga Beach, although the province has enabled phased exemptions, and I couldn’t verify the final exemption instruments as of this review. [20] Grey County retains an approval role for Grey Highlands, as a September 2026 local notice shows. [21]

Where to look: your six-municipality research map

Each municipality publishes its own list or map of active files. None is a complete inventory of every future home, so use them as a starting point.

  • Collingwood: the Town’s Proposed Major Developments directory lists current applications, and it warns that it isn’t comprehensive. [22]
  • The Blue Mountains: the Planning and Development Projects page has keyword filters and an interactive project map, and refers County-level applications to Grey County. [23]
  • Clearview: the Current Projects page lists applications under review and states that it isn’t comprehensive. [24]
  • Grey Highlands: the Planning page links a continuously updated applications list. [25]
  • Meaford: the Current Developments page tracks major proposals and approvals, with a map. [26]
  • Wasaga Beach: the Planning and Development page links an active development map and public notices. [27]

Two more tools help. Grey County’s Active Development page lists county-level files with file numbers and links, which helps you avoid counting the same project twice under its official plan, zoning and subdivision applications. [28] And the Ontario Land Tribunal’s case status search shows active and recently closed appeals. A missing result doesn’t prove there is no appeal, because new filings can take weeks to appear. [29]

For each project you care about, write down the address or legal description, application type, the number of units requested, the date of the latest drawings, and the decision, including its conditions and lapse date. That one page tells you far more than a sales brochure.

Servicing: the quiet gatekeeper of future supply

Land can be zoned and approved, and still not build if there isn’t enough water and sewage capacity. A servicing allocation reserves part of the municipality’s water and wastewater capacity for a specific project. It’s different from land-use approval and from pipes being nearby. Ontario law now expressly allows municipalities to adopt allocation policies. [18]

The situation is quite different from one municipality to the next.

Collingwood. The Town’s water treatment plant expansion has been under construction since July 2024, and an additional 5,000 cubic metres a day of interim drinking-water capacity came online at the end of July 2026. Further supply is expected in late 2029, with the full facility complete in 2032. [30] A Town report at the end of 2025 counted uncommitted reserves of 670 single-dwelling equivalents for water and 4,636 for wastewater, but that was a snapshot. [31] Wastewater expansion is at the environmental-assessment stage, not construction. [32]

The Blue Mountains. The Thornbury wastewater plant is being expanded from 3,580 to 5,330 cubic metres a day. Phase 1 of the plant is substantially complete, and a 1.5-kilometre offshore outfall pipe is under construction, with installation updates through mid-November 2026. [33]

Clearview. Stayner’s water system remains at capacity. A new well, reservoir and pumping station, plus an eight-kilometre watermain, are being built, with the final connection and facility completion expected in fall 2027. Until then, the Township says no new water units can be issued for development that needs allocation not already secured. [35] Creemore’s servicing is a separate question, with a master servicing plan completed in 2024 and upgrade design under way. [36]

Meaford. The Municipality is reviewing whether and when wastewater plant expansion is needed, with a flow review due December 31, 2026. Its 2025 annual report shows average flows of about 62% of design capacity. That’s an operating figure, not a promise that every pending project can connect. [37]

Grey Highlands. The Markdale lagoon expansion completed its environmental assessment in March 2026. A July 2026 study advances construction to 2027, with a new area-specific development charge from January 1, 2027. [39] That’s financing and planning, not a plant in operation.

Wasaga Beach. The Town’s water and wastewater page describes the system but doesn’t publish an uncommitted capacity balance, and I couldn’t verify one. [41]

If you’re evaluating a specific project, ask whether both water and wastewater have been allocated, for how many units, and what happens to the allocation if construction stalls.

What’s actually happening, by municipality

The projects below reflect what the official sources showed in late November 2026. Unit counts are proposals or approvals, not homes ready to move into.

Collingwood

Pretty River Reserve is a 33-townhouse draft plan of subdivision, deemed complete September 18, 2026, and still under review. [42] Summitview Phase 3 on Poplar Sideroad has a draft plan of 136 units, and the Town’s main page lists an older description, so confirm the latest count. [43] Sunvale Homes is actively marketing Poplar Trails at Poplar Sideroad and Portland, so check whether it sits on lands already counted in other applications before adding unit totals. [44]

Terminals Point, the grain terminals redevelopment, is still in design and planning. A July 2026 staff report notes schedule delays, and no groundbreaking date is confirmed. [45] The new Official Plan is in force from October 30, 2024, except for twelve site-specific appeals and four areas of non-decision, so check whether a specific parcel is affected.

The Blue Mountains

Windfall Phase 6 has 166 approved dwellings and is in build-out, within a 659-unit Windfall plan. [46] Lora Bay Phase 4B has 58 draft-approved units, with a draft-plan extension approved November 23, 2026. [47] Eden Oak Trailshead in Craigleith has 194 units overall. Council removed holds on 85 and 50 townhouse units in 2026, while a further 59 condominium townhouses remain held. [48]

Hinds Brook in Clarksburg was revised in 2026 to 245 proposed units, down from 376, and remains under review. [49] Castle Glen has no active submitted development, so treat it as long-term potential rather than supply. [50] The Town’s building statistics show 119 dwelling units issued from January to October 2026. [51]

Wasaga Beach

The Destination Wasaga master plan, unveiled September 24, 2026, is a long-term framework, not an approved construction programme. [52] Within it, the Stonebridge beachfront mixed-use project (The Breakers) is under construction, with approximately 150 residential units. Sunray’s hotel of about 160 rooms received zoning in June 2026, but a construction start isn’t confirmed, and hotel rooms aren’t homes. [52]

On the subdivision side, 31 Marlwood Avenue received draft approval with conditions on August 13, 2026 for 59 detached lots. [54] Georgian Sands, a master-planned community of more than 1,500 homes, is selling its final inventory. [55] Wasaga’s base development charge for a single or semi-detached home is $39,769 under by-laws effective May 24, 2026, with extra wastewater charges in the Beach Area. [56]

Clearview Township

The Estates of Clearview received revised conditional draft approval on November 9, 2026, with an 800-unit draft plan, and the appeal period was open until December 2. [57] Creemore Commons has a 474-unit plan after a 2026 revision, with zoning passed April 27, 2026. [58] A much larger Creemore proposal, approximately 939 dwellings submitted in October 2026, is a proposal only. [24]

Remember Stayner’s water limits above. A big draft plan doesn’t mean quick building.

Meaford

Loon Call Phase 1 (97 registered units) and part of Golf Course Phase B are under construction. [59] A 412 Miller Street subdivision of approximately 122 units has draft plan and zoning approval, with infrastructure design next. [61] Georgian Bay Terrace, about 150 condominium apartments, has zoning and site-plan approval but is still listed at the building-permit stage. [62] The Parkbridge proposal for approximately 1,250 units is an early-stage official plan amendment request, not approved supply. [63]

Grey Highlands

Markdale’s Loon Call subdivision received revised draft approval on March 31, 2026 for 471 dwellings. The County’s decision supersedes a webpage that still shows 483. [64] Centre Point South has built homes and active sales. [65] Flesherton has a nine-unit stacked-townhouse rezoning proposal with unresolved sewer-capacity and water questions. [66] The new Markdale hospital opened in 2023, and the old hospital site was sold in May 2026 with plans not yet known. [67]

Reading building-permit numbers without fooling yourself

Permit reports are useful, but each municipality counts differently, so you can’t line them up like a league table.

Collingwood’s July 2026 year-to-date report shows 40 municipal housing starts and 18 primary dwelling units issued. [68] The Blue Mountains issued 119 dwelling units from January to October 2026. [51] Grey Highlands’ full-year 2025 report shows 507 permits, of which 55 were for detached dwellings. [69] Permits aren’t completions, and “507 permits” doesn’t mean 507 new homes.

What a new neighbour can mean for your market

Supply and demand are local. A large project can add choice for buyers, and it can also bring construction traffic and a year or two of noise. Sometimes the new homes lift an area with new shops and services. Sometimes they simply add competition for resale listings.

Monthly resale numbers give some background. Royal LePage Locations North’s October 2026 reports show 24 unit sales in Clearview (average $989,250, median $727,000), nine in Meaford (average $546,170, median $584,071) and 17 in Grey Highlands (average $800,735, median $650,000). [70] [72] These are one-month samples of all property types and small enough that a few sales can swing the averages, and the reports warn of possible discrepancies after a recent board and reporting-system change. They don’t measure new-development effects, so use them to see the market, not to predict what a project will do to your street.

If you’re buying a pre-construction or new home

Check the builder as carefully as the project. The Home Construction Regulatory Authority’s Ontario Builder Directory lets you search the legal vendor and builder, including licence status and any conduct actions. [73]

Understand what’s protected. For freehold agreements signed on or after January 1, 2018, Tarion protects deposits up to $60,000 for prices of $600,000 or less, or 10% of the price up to $100,000 above that. For condominiums, Tarion adds up to $20,000 on top of the deposits that must already be held in trust. [74] Compensation for qualifying closing delays is capped at $7,500. [75] Since April 1, 2026, freehold purchasers must notify Tarion within 45 days, and the effect on deposit coverage is deferred to January 1, 2027. [76] A broad new freehold cooling-off period has been postponed to January 1, 2028, so don’t assume you have one. [77]

Ask your lawyer to review the agreement’s conditions around financing, servicing, site-plan approval and closing dates. Development charges are also worth understanding. In 2026, published single-detached base rates include $83,038 in Collingwood (January 2026 schedule), $24,368 as the Town-wide rate in The Blue Mountains, $40,900.54 in Stayner and $24,378 for a fully serviced Grey Highlands lot. [78] [80] Those are starting points, not quotes. Ask the seller who pays and whether the price can be adjusted for later charges. Since November 3, 2025, non-rental residential development charges are generally due at the earlier of occupancy permit or first occupancy. [82]

How this plays out for different buyers

First-time buyers. New townhomes can offer lower maintenance and modern efficiency, and deposit protection and warranty add comfort. Focus on the closing date risk, the total cost after development charges and whether servicing is secured.

Growing families. Look at the whole neighbourhood plan: parks, school blocks, trails and how many phases are still to come. Construction can run for years in a large community, so ask about phase timing.

Four-season escapes and second properties. Check zoning, short-term rental rules and condo or common-element fees before you count on rental income. A resort-area project can look permanent on a rendering and still be in its first phase.

Luxury buyers. Protect your views and privacy by researching adjacent lands. Look at what’s designated or zoned beside your lot, not only what’s built today.

Downsizers. Condominium apartments and adult-lifestyle communities can suit you well. Confirm occupancy dates, fees and what’s included, and make sure you have a plan if closing is delayed.

A simple checklist before you rely on any project

  1. Identify the exact municipality, address and application or file numbers.
  2. Find the latest decision, conditions, lapse date and any appeal.
  3. Confirm which approval stage it has reached: proposal, draft approval, registration, site plan, permit or construction.
  4. Ask whether both water and wastewater allocation are secured.
  5. Compare unit counts across documents, and use the latest dated one.
  6. Search the builder and vendor in the HCRA directory, and confirm Tarion enrolment.
  7. Request a written development-charge breakdown and closing-date terms.
  8. Check what’s next door, including zoning and designations on adjacent lands.
  9. Recheck before you go firm, because statuses change.

Frequently asked questions

Does “approved” mean homes are coming soon? Not necessarily. A draft plan can be approved with conditions, and it can still need servicing, registration, site plan and permits before the first home is built. [14]

Where can I see what’s proposed near a property I’m considering? Start with the municipality’s development list or map, then check the County’s page if the file is a county application. [22] [24] [26] [28]

Can neighbours appeal a new development? Under current rules, appeal rights for official plan and zoning decisions are limited to specific parties such as affected landowners, public bodies and certain others. Check the notice for the actual deadline and who can appeal. [18]

Is a builder’s licence enough to protect my deposit? No. A licence shows the vendor and builder are authorized, but deposit protection depends on the type of home and the agreement, and you should have a lawyer review the agreement. [73]

Do growth forecasts mean prices will rise? No. Forecasts describe expected population and housing demand. They aren’t price predictions. [8]

Want help researching a project?

New neighbourhoods across Southern Georgian Bay can be great places to live, and they can also come with timing and servicing risks you can’t see from a sales centre. We’re happy to help you compare projects, read the planning file, and put together questions for your lawyer before you commit.

This article is general information, not legal, planning, tax or financial advice. Project statuses, fees and rules were reviewed on November 26, 2026 and can change. Confirm details for any specific property or project with the municipality and your professional advisers.

Sources

  1. Collingwood 2021 Census Profile — Statistics Canada
  2. Clearview 2021 Census Profile — Statistics Canada
  3. Wasaga Beach 2021 Census Profile — Statistics Canada
  4. The Blue Mountains 2021 Census Profile — Statistics Canada
  5. Meaford 2021 Census Profile — Statistics Canada
  6. Grey Highlands 2021 Census Profile — Statistics Canada
  7. Census release plans — Statistics Canada
  8. Municipal Comprehensive Review and OPA 7 — County of Simcoe
  9. Growth Forecasts and Land Needs Assessment, March 2022 — Hemson for County of Simcoe
  10. Growth Management Strategy — County of Grey
  11. Growth Management Plan Update, February 2026 — Hemson for County of Grey
  12. Citizens’ Guide to Land Use Planning: Official Plans — Government of Ontario
  13. Citizens’ Guide to Land Use Planning: Zoning By-laws — Government of Ontario
  14. Citizens’ Guide to Land Use Planning: Subdivisions — Government of Ontario
  15. Citizens’ Guide to Land Use Planning: Building Permits — Government of Ontario
  16. Provincial Planning Statement, 2024 — Government of Ontario
  17. Bill 23 Planning Act Decision — Environmental Registry of Ontario
  18. Bill 185 Planning Act Decision — Environmental Registry of Ontario
  19. Proposed Bill 140 Planning Act Changes — Environmental Registry of Ontario
  20. Planning — County of Simcoe
  21. Notice of Adoption of Official Plan Amendment, September 2026 — Municipality of Grey Highlands
  22. Proposed Major Developments — Town of Collingwood
  23. Planning and Development Projects — Town of The Blue Mountains
  24. Current Projects — Township of Clearview
  25. Planning — Municipality of Grey Highlands
  26. Current Developments — Municipality of Meaford
  27. Planning and Development — Town of Wasaga Beach
  28. Active Development — County of Grey
  29. Case Status — Ontario Land Tribunal
  30. Two Years of Progress on the Water Treatment Plant, August 2026 — Town of Collingwood
  31. Staff Report IN2026-03, Hydraulic Reserve Capacity, April 2026 — Town of Collingwood
  32. Staff Report CAO2026-06, Terminals Point and Wastewater EA Status, 2026 — Town of Collingwood
  33. Thornbury Wastewater Treatment Plant Expansion — Town of The Blue Mountains
  34. Outfall Pipe Assembly and Installation — Town of The Blue Mountains
  35. Klondike Park Road Well Site Update, November 19, 2026 — Township of Clearview
  36. Creemore Water and Wastewater Master Servicing Plan — Township of Clearview
  37. Wastewater Treatment Plant Expansion — Municipality of Meaford
  38. 2025 Wastewater Treatment Plant Annual Report — Municipality of Meaford
  39. Markdale Wastewater Environmental Assessment — Municipality of Grey Highlands
  40. Markdale Lagoon Expansion Area-Specific Development Charges Study, July 2026 — Hemson for Grey Highlands
  41. Water and Wastewater — Town of Wasaga Beach
  42. Pretty River Reserve — Town of Collingwood
  43. Summitview Phase 3, 7914 Poplar Sideroad — Town of Collingwood
  44. Poplar Trails, Collingwood — Sunvale Homes
  45. Terminals Point Project — Town of Collingwood
  46. Windfall Phase 6 — Town of The Blue Mountains
  47. Lora Bay Phase 4B — Town of The Blue Mountains
  48. Eden Oak Trailshead — Town of The Blue Mountains
  49. Hinds Brook and Homefield — Town of The Blue Mountains
  50. Castle Glen — Town of The Blue Mountains
  51. Permit Activity, October 2026 — Town of The Blue Mountains
  52. Destination Wasaga Master Plan, September 2026 — Town of Wasaga Beach
  53. Notice of Passing, Sunray Beach Drive Inc., June 2026 — Town of Wasaga Beach
  54. Notice of Decision, 31 Marlwood Avenue Subdivision, August 2026 — Town of Wasaga Beach
  55. Georgian Sands, Wasaga Beach — ELM Developments
  56. Notice of Passing of Development Charges By-laws, May 2026 — Town of Wasaga Beach
  57. Notice of Decision, The Estates of Clearview, November 2026 — Township of Clearview
  58. Staff Report PB-012-2026, Creemore Commons — Township of Clearview
  59. Loon Call Subdivision — Municipality of Meaford
  60. Golf Course Phase B Subdivision — Municipality of Meaford
  61. 412 Miller Street Subdivision — Municipality of Meaford
  62. Georgian Bay Terrace — Municipality of Meaford
  63. Parkbridge Lifestyle Communities — Municipality of Meaford
  64. Loon Call Markdale Subdivision — County of Grey
  65. Centre Point South, Markdale — Devonleigh Homes
  66. Planning Report 2026-10, Canyon Hill Developments — Municipality of Grey Highlands
  67. Markdale Hospital Legacy Site Advisory — Brightshores Health System
  68. Year-to-Date Building Permit Summary, July 2026 — Town of Collingwood
  69. Building Services Q4 2025 Year-End Summary — Municipality of Grey Highlands
  70. Clearview Market Report, October 2026 — Royal LePage Locations North
  71. Meaford Market Report, October 2026 — Royal LePage Locations North
  72. Grey Highlands Market Report, October 2026 — Royal LePage Locations North
  73. Ontario Builder Directory — Home Construction Regulatory Authority
  74. Coverage Before You Move In — Tarion
  75. Freehold Closing Dates and Delays — Tarion
  76. Register My Home — Tarion
  77. Ontario Postpones New Freehold Home Cooling-Off Requirements to 2028 — Aird and Berlis LLP
  78. Development Charges, January 1, 2026 — Town of Collingwood
  79. 2026 Development Charges Pamphlet — Town of The Blue Mountains
  80. Development Charges Pamphlet, March 2026 — Township of Clearview
  81. Development Charges Guide, 2026 — Municipality of Grey Highlands